ADU permit rules by county
Accessory dwelling units, and the size or zoning line the city actually printed. Cities are in the list too. A city rule is not the county rule, even when the city sits inside that county. Open a row for the quote and the link.
Arizona
- City of PhoenixYes
Yes. Phoenix still wants a plot or site plan to permit an ADU, even when you use a free pre-approved plan. On a lot with one single-family house, two ADUs are allowed, and a third in some cases. Each ADU may be up to 75 percent of the main house's floor area, and not over 1,000 square feet on a lot up to 10,000 square feet, or 3,000 square feet on a larger lot. Changing an approved standard plan means a new submittal. Zoning questions go to [email protected].
California
- City of BerkeleyYes
Yes. Berkeley says every ADU and every junior ADU needs a building permit. A new application includes a $500 fee so the city can mail a courtesy notice to neighbors. That notice is not a hearing, and the city says an approved ADU permit is not appealable. An ADU other than a junior unit also needs a new address, which is a $250 assignment. The building-permit fee is a separate estimate.
Florida
- City of OrlandoYes
Yes, an ADU goes through Permitting Services. Orlando allows one accessory unit on an eligible single-family lot. Up to 500 square feet needs a smaller minimum lot, and up to 1,000 square feet needs a larger one. The unit must be smaller than the main house. Historic districts cap the ADU at 700 square feet and want a Certificate of Appropriateness first. A new ADU's general sewer impact fee is $1,319.50. School impact fees are exempt. The building-permit price is calculated in the city's portal.
Rules not published yet — contact the department
- Marion County, Florida — 352-438-2400
- Miami-Dade County, Florida — 786-315-2000
- Ocala, Florida — 352-629-8421
- Orange County, Florida — (407) 836-5550
- Tampa, Florida — (813) 274-3100
- Henderson, Nevada — 702-267-3620
- Las Vegas, Nevada — 702-229-6251