City · checked November 20, 2026
Do I need an ADU permit in Berkeley, California?
Yes. You need a permit.
Yes. Berkeley says every ADU and every junior ADU needs a building permit. A new application includes a $500 fee so the city can mail a courtesy notice to neighbors. That notice is not a hearing, and the city says an approved ADU permit is not appealable. An ADU other than a junior unit also needs a new address, which is a $250 assignment. The building-permit fee is a separate estimate.
Rules change, and a handout can be older than the code book. This page was checked on November 20, 2026. Confirm it with the local building department before you buy materials or hire someone.
City of Berkeley. If a job is not on the city's exempt list, the city says to assume you need a permit. Zoning can still apply when a building permit does not.
Cutoffs they actually printed
Courtesy notice
$500
Collected with a new ADU building permit application.
Address assignment
$250
Required for an ADU other than a junior ADU, before the building permit is issued.
What the page says
All ADUs and junior ADUs require a building permit.
All ADUs and Junior ADUs require a building permit.
City of Berkeley, Residential additions and accessory dwelling units · checked November 20, 2026
The city collects $500 with a new ADU building permit application to cover the courtesy notice to neighbors.
A fee of $500 is collected with the new ADU building permit application to cover the notice.
City of Berkeley, Residential additions and accessory dwelling units · checked November 20, 2026
Every ADU except a junior ADU needs a new address. The assignment request is $250 and is paid before the building permit is issued.
All ADUs, except Junior ADUs, require a new address assignment. Submit the address assignment request for your ADU to the Building and Safety Division with a non-refundable payment of $250 prior to issuance of the building permit.
City of Berkeley, Residential additions and accessory dwelling units · checked November 20, 2026
The Permit Service Center is (510) 981-7500 and [email protected].
Email: [email protected]. Phone: (510) 981-7500.
City of Berkeley, Work Exempt from Building Permits · checked November 19, 2026
Fee
$500 courtesy-notice fee
Berkeley collects a $500 fee with a new ADU building permit application to mail the courtesy notice. An address assignment for an ADU other than a junior ADU is a separate $250. The building permit fee itself is run through the city's estimator and is not a single printed number.
Who to call
City of Berkeley Permit Service Center
Also in Berkeley
- Deck · It depends
- Driveway · It depends
- Fence · It depends
- Swimming pool · It depends
- Roof replacement · Yes
- Shed · It depends
- Rooftop solar · Yes
- Water heater · Yes
Nearby, same question
No neighboring jurisdiction is written up beside this one.
ADU permit rules by county also covers Phoenix, Orlando. Rules not published yet — contact the department: Marion County, Florida, Miami-Dade County, Florida, Ocala, Florida, Orange County, Florida, Tampa, Florida, Henderson, Nevada, and Las Vegas, Nevada.
Questions this page answers
- Do I need an ADU permit in Berkeley, California?
- Yes. Berkeley says every ADU and every junior ADU needs a building permit. A new application includes a $500 fee so the city can mail a courtesy notice to neighbors. That notice is not a hearing, and the city says an approved ADU permit is not appealable. An ADU other than a junior unit also needs a new address, which is a $250 assignment. The building-permit fee is a separate estimate.
- Is there a size or height cutoff in Berkeley?
- Courtesy notice: $500. Collected with a new ADU building permit application. Address assignment: $250. Required for an ADU other than a junior ADU, before the building permit is issued.
- How much is the permit fee in Berkeley?
- Berkeley collects a $500 fee with a new ADU building permit application to mail the courtesy notice. An address assignment for an ADU other than a junior ADU is a separate $250. The building permit fee itself is run through the city's estimator and is not a single printed number.
- Who do I call to confirm the adu rule?
- City of Berkeley Permit Service Center. Phone (510) 981-7500. Email [email protected]. Rules on this stuff change. Confirm it with them before you buy materials or hire someone.