County
Orange County, Florida
Unincorporated Orange County. The county says its guide is not a complete list. It also names extra steps for the City of Edgewood and the Ranger Drainage District.
Rules change, and a handout can be older than the code book. This page was checked on November 20, 2026. Confirm it with the local building department before you buy materials or hire someone.
Fence
YesYes. A fence needs a permit in unincorporated Orange County. At 6 feet or under, Zoning issues it. Over 6 feet, or if it is masonry, it is a building permit. The county does not describe a height where you can skip both.
Shed
YesYes. Every shed needs a permit. The short guide says a structure of 120 square feet or less may sit outside the building code and you still apply. The accessory-structure page is sharper: a footprint of 120 square feet or less is a zoning permit, and Building Department code review and engineered plans are not required. Larger than that, you are in the full plan submittal. No height cutoff is printed.
Deck
YesYes. Orange County lists a deck as an accessory structure, next to sheds and pergolas, and says a building permit is required for all structures. A footprint of 120 square feet or less is still a permit, issued as a zoning permit, without Building Department code review or engineered plans. The page does not print a height-above-grade cutoff. Do not borrow one from another county.
Water heater
YesYes. Replacing a water heater needs a plumbing permit, and it may also need an electrical permit. The county's guide does not give a gallon size, a wattage, or a same-for-same exception. At least a final inspection has to pass.
Roof replacement
YesYes. Orange County says a replacement roof needs a roof permit. A re-roof needs an in-progress inspection and a final inspection. A roof-over needs a permit and a final inspection only. The guide does not print a square-foot size that skips the permit, and it does not print a fee.
Swimming pool
YesYes for both kinds. The short guide says a pool needs a building permit, plus electrical, plumbing, and gas sub-permits when they apply. The county also publishes separate submittals for in-ground pools and above-ground pools. Above-ground pools with a wall under 48 inches, and no removable ladder, have extra barrier rules. A wood deck or platform to get into the pool is its own permit. No fee is printed.
Driveway
YesYes. Orange County says pouring concrete or placing pavers needs a permit. A concrete driveway is in that sentence. Pavers are a zoning permit only. The guide does not split a private driveway from a curb cut in the right-of-way, and it does not print a fee.
Rules not published yet — contact the department: Rooftop solar and ADU. Orange County Division of Building Safety, (407) 836-5550.
Who to call
Orange County Division of Building Safety
201 South Rosalind Avenue, 1st Floor, Orlando, FL 32802