City of Berkeley, California
City of Berkeley. If a job is not on the city's exempt list, the city says to assume you need a permit. Zoning can still apply when a building permit does not.
Rules change, and a handout can be older than the code book. This page was checked on November 20, 2026. Confirm it with the local building department before you buy materials or hire someone.
Fence
It dependsA fence under 7 feet does not need a building permit. A fence over 6 feet needs a zoning permit. Between 6 and 7 feet you can skip the building permit and still have zoning to deal with. At 7 feet, you are off the building-permit exemption, and the city says to assume you need a permit if the work is not on the list.
Shed
It dependsA one-story detached tool or storage shed, or a playhouse, does not need a building permit if the floor area is not over 120 square feet. The page does not print a setback distance. Bigger than 120 square feet, it is not on the exempt list, and Berkeley says to assume you need a permit.
Deck
It dependsOn a house or duplex, a deck can skip the building permit only if all of this is true: not over 200 square feet, not more than 30 inches above grade at any point, not attached to the house, and not serving the required exit door. Miss one of those and it is not on the exempt list. The city then says to assume you need a permit.
Water heater
YesYes, assume you need a permit. Berkeley says replacing a plumbing system needs a permit, and then it lists the plumbing work that does not. That list is leaks, stoppages, and reinstalling a toilet without rearranging the pipes. A water heater replacement is not on it. The city says if your job is not on the list, assume you need a permit from the Permit Service Center.
Roof replacement
YesYes, assume you need a permit. Berkeley's exempt list names small sheds, some fences, some decks, and some above-ground prefab pools. A roof replacement is not on it. The city says if your job is not on the list, assume you need a permit from the Permit Service Center.
Swimming pool
It dependsA prefabricated pool next to a house or similar R-3 building does not need a building permit when it is less than 24 inches deep, not over 5,000 gallons, and entirely above ground. Anything else is not on the exempt list, and Berkeley says to assume you need a permit. That includes a typical in-ground pool. No fee is printed on the exempt-work page.
Rooftop solar
YesYes, assume you need a permit. Rooftop solar is not on Berkeley's list of work exempt from a building permit. The city says if the work is not on that list, assume you need a permit from the Permit Service Center. The page does not print a system size or a fee.
Driveway
It dependsA driveway not more than 30 inches above adjacent grade, not over a basement, and not part of an accessible route, does not need a building permit. Berkeley does not say a curb cut in the public right-of-way is included. A higher driveway, or one that is an accessible route, is off the list, and the city says to assume you need a permit.
ADU
YesYes. Berkeley says every ADU and every junior ADU needs a building permit. A new application includes a $500 fee so the city can mail a courtesy notice to neighbors. That notice is not a hearing, and the city says an approved ADU permit is not appealable. An ADU other than a junior unit also needs a new address, which is a $250 assignment. The building-permit fee is a separate estimate.
Who to call
City of Berkeley Permit Service Center
Next door
No neighboring city or county is written up next to this one yet.