Deck permit rules by county
Height above the ground, and the counties that never answered the question. Cities are in the list too. A city rule is not the county rule, even when the city sits inside that county. Open a row for the quote and the link.
Arizona
- City of PhoenixIt depends
An open deck can skip the permit when it is not more than 30 inches above grade, not over a basement or story below, and not part of an accessible route. The handout says decks and sport courts with no roof are in that exception. A patio cover is a different project. The residential page lists patio covers with the work that needs a permit.
California
- City of BerkeleyIt depends
On a house or duplex, a deck can skip the building permit only if all of this is true: not over 200 square feet, not more than 30 inches above grade at any point, not attached to the house, and not serving the required exit door. Miss one of those and it is not on the exempt list. The city then says to assume you need a permit.
Florida
- Miami-Dade CountyIt depends
A wood deck 18 inches or less above the ground does not need a permit, and that line sits in a list the county caps at $5,000 of combined work in any 12-month period. The page does not say a higher deck is exempt. It also does not say the deck can be attached, roofed, or made of something other than wood and still use this line.
- Orange CountyYes
Yes. Orange County lists a deck as an accessory structure, next to sheds and pergolas, and says a building permit is required for all structures. A footprint of 120 square feet or less is still a permit, issued as a zoning permit, without Building Department code review or engineered plans. The page does not print a height-above-grade cutoff. Do not borrow one from another county.
- City of OrlandoIt depends
Orlando's small-job exemption, the one for single-family work under $7,500, does not cover elevated decks. The city lists elevated decks with the structural work that still needs a permit no matter the cost. The guide does not say how high 'elevated' is, and the residential checklist does not have its own deck section. A deck that is not elevated is not answered on these pages. Call Permitting Services before you treat a low deck as exempt.
Nevada
- City of Las VegasIt depends
A deck more than 30 inches above grade needs a permit. That is the sentence on the permit-required list. The guide's no-permit list does not say a lower deck is exempt, so that half of the question is not published. Call Building and Safety before you build a low deck and assume you are clear.
Rules not published yet — contact the department
- Marion County, Florida — 352-438-2400
- Ocala, Florida — 352-629-8421
- Tampa, Florida — (813) 274-3100
- Henderson, Nevada — 702-267-3620