Do I need a rooftop solar permit in Phoenix, Arizona?

Yes. You need a permit.

Yes. You need a permit.

Yes. Phoenix accepts a residential rooftop photovoltaic permit, and it will take a SolarAPP+ approval for projects that fit the eligibility list. That path is for a licensed Arizona contractor, on a house or duplex, rooftop only, with no battery, no ballast, and no ground mount. The roof load cannot exceed 4 pounds per square foot. A revision that changes the record is $37.50. The original permit price is not printed as one number. Fire also wants its own permit.

Rules change, and a handout can be older than the code book. This page was checked on November 20, 2026. Confirm it with the local building department before you buy materials or hire someone.

City of Phoenix. These notes come from the residential projects page and the city's work-exempt handout. They are not a rule for the rest of Maricopa County.

Cutoffs they actually printed

What the page says

Fee

No fee for this job was printed on the page we checked.

The page prints a $37.50 fee to update an existing SolarAPP permit. It does not print a flat fee for the original permit.

Fee source

Who to call

City of Phoenix Planning and Development, Residential Building

Also in Phoenix

Nearby, same question

No neighboring jurisdiction is written up beside this one.

Rooftop solar permit rules by county also covers Berkeley, Orlando, Las Vegas. Rules not published yet — contact the department: Marion County, Florida, Miami-Dade County, Florida, Ocala, Florida, Orange County, Florida, Tampa, Florida, and Henderson, Nevada.

Questions this page answers

Do I need a rooftop solar permit in Phoenix, Arizona?
Yes. Phoenix accepts a residential rooftop photovoltaic permit, and it will take a SolarAPP+ approval for projects that fit the eligibility list. That path is for a licensed Arizona contractor, on a house or duplex, rooftop only, with no battery, no ballast, and no ground mount. The roof load cannot exceed 4 pounds per square foot. A revision that changes the record is $37.50. The original permit price is not printed as one number. Fire also wants its own permit.
Is there a size or height cutoff in Phoenix?
Roof load: Not over 4 psf. One of the technical limits for the SolarAPP+ path. Revision fee: $37.50. Planning and Development charges this to update an existing SolarAPP permit after a revision.
How much is the permit fee in Phoenix?
The page prints a $37.50 fee to update an existing SolarAPP permit. It does not print a flat fee for the original permit.
Who do I call to confirm the rooftop solar rule?
City of Phoenix Planning and Development, Residential Building. Phone (602) 261-8078. Email [email protected]. Rules on this stuff change. Confirm it with them before you buy materials or hire someone.